Introduction to Purchase
The procurement process commences with the creation of a "Material Request." Subsequently, this request follows one of two pathways, contingent upon the specific requirement:
For items necessitating procurement:
After generating a material request, the initial step is to initiate a "Request for Quotation" (RFQ). This document is dispatched to suppliers to solicit quotes for the required materials.
Upon receipt of the quotations, the subsequent stage involves reviewing the "Supplier Quotation," delineating proposed prices and terms from various suppliers.
Perhaps Supplier Quotation can be added without initiating "Request for Quotation" if quotation details are already available.
Following the selection of a supplier based on the quotation, a "Purchase Order" is issued to procure the requested materials.
For items to be transferred from existing stock (Issued from the store):
Should there be a need to issue items from the stock at the construction site or move them to a different location, the stock entry module can be utilized.